Skip to main content

benecaster_podcast_workflow_after_save_plan

Action Premium podcast-workflow

Fires once an episode’s Podcast Workflow production plan has been written: started, its tasks changed, finalised or sent back to draft, or a task’s status set. It fires only once the write is done.

Parameters

Name Type Default Description
$episode_id int — The episode whose plan is being written
$plan array — The plan as stored: `{ tasks: [ { id, name, offset_days, duration_days, preset_id, status } ], finalised, finalised_at }`
$show_id int — The episode's own show

Example

add_action( 'benecaster_podcast_workflow_after_save_plan', function ( int $episode_id, array $plan, int $show_id ): void {
    update_post_meta( $episode_id, '_my_plugin_task_count', count( $plan['tasks'] ) );
}, 10, 3 );

Notes

A plan moves with its episode and there is no move hook to add. Due dates are relative to the publish date and never stored. Walkthrough: Read or change an episode's production plan, change how a new plan starts, and run code when a plan is finalised.

Affects

  • Workbench
  • POST benecaster-podcast-workflow/v1/shows/{show_id}/episodes/{episode_id}/plan
  • PUT benecaster-podcast-workflow/v1/shows/{show_id}/episodes/{episode_id}/plan
  • PUT benecaster-podcast-workflow/v1/shows/{show_id}/episodes/{episode_id}/plan/finalised
  • PUT benecaster-podcast-workflow/v1/shows/{show_id}/episodes/{episode_id}/plan/tasks/{task_id}/status

Need this built rather than just documented? See our services →